| |

First the pipe is cleaned using water at high pressure.
|
|

Supple, uncured inpipe is inserted with the aid of compressed air
|

The pipe is cured by ultraviolet light.
|
|

A robot, monitored by video camera, re-opens laterials.
.. |
Installed
by compressed air
The flexible Inpipe liner is installed into the old pipe with the aid of
compressed air. This procedure demands very little space, and the equipment
needed is easy to transport to the site.
..
Finally
cured using uv light
With the Inpipe liner pressed against the walls of the old pipe by
the air pressure which is maintained throughout the installation process,
a "train" of ultraviolet curing lights is drawn through
the pipe. The function of the UV lights is to cure and harden the
liner. With its glass-fibre reinforcement, it is transformed into
a strong new pipe, with an excellent ability to withstand internal
and external loads, and a long service life. |

Installation
unit interior |
..
|